Self-owned heavy hauling equipment
Engineering Plan
Civil Works of bridge enforcement...
Positioning of heavy lift cargo
Mechanical and Electrical installation
Smooth connection with logistics
Competitive door to door solution
Professional operation
Smooth cross-language communication
Cargo Specification: 15.12*4.95*4.68m, 48ton Project time:2014.09-2014.12 Logistics Route: Zhangjiagang-Shanghai-Hamburg-Quebec project App
Cargo Specification: 5.7*5.7*1.4m, 27.3ton Project time: 2013.03-2013.07 Logistics Route: Zhenjiang-SAVANHAH-Freeport project Applied Equipm
Project time: 2016.06-2016.09 Cargo Specification: PHX Package Assembly, 22.45*5.79*4.50m, 136.08ton Logistics Route: Fengxian District, Shanghai- Nanjing Chemical Industrial Park
ADL owned heavy lift transporting equipments, including Mecedes Benz prime mover and Goldhofer axle trailers, as well as 700 tons and 250 tons girder bridge
As working for heavy lift cargo, we understand how important for job site experience. We have average more than 5 years job site experience per person.
With in-house engineering department,Aqua-Dragon will do the force calculation and draw the engineering plan to prove the solution’s feasibility and guarantee the operation safety
Aqua-Dragon introduce project management concept on all operation. to control the resources risk and progress
18
04-2018
After the global financial crisis in 2008, the shipping industry entered a long cold winter, and companies in the industry have entered a difficult situation of high debt operations...
18
04-2018
Our company was commissioned by domestic customers to arrange 4 marine main engines from Shanghai Haitong Terminal to be lifted from the Mafi board to the vehicle board,..
Copyright © 2003-2017 ADL International Logistics All Rights Reserved
Brand website building : ctmon